50 ton bridge crane mechanical and electrical diagram 3D 模型

$ 22.00 USD
你有 $0.00 学分. 买学分
50 ton bridge crane mechanical and electrical diagram 3D 模型
$ 22.00
删除 添加到书签
  • 动画:
    No
  • 纹理:
    No
  • 操纵:
    No
  • 材料:
  • 低聚:
    No
  • 集合:
    No
  • UVW 贴图:
    No
  • 使用插件:
    No
  • 打印准备:
    No
  • 3D扫描:
    No
  • 成人内容:
    No
  • PBR:
    No
  • 几何:
    Polygonal
  • 包装 UVs:
    Unknown
  • 日期:
    4237
  • 日期: 2022-08-20
  • 项目 ID:
    411493

50 ton bridge crane mechanical and electrical diagram 3D 模型 dwg, 从 tzd

50 ton bridge crane mechanical and electrical diagram
Including: electrical drawings, mechanical drawings, list of purchased parts, instructions, and can be produced directly according to the drawings.
General Overhead Crane Instruction Manual

This manual is used for electric hooks, grab buckets, electromagnetic, dual-purpose, triple-purpose, explosion-proof, insulation, hanging beam, large lift, slow speed, double speed, double trolley, ground control for indoor and outdoor fixed span operations. Installation and commissioning, delivery acceptance and use and maintenance of bridge cranes.
This manual introduces the typical structure and usage characteristics of various types of general-purpose overhead cranes. Please refer to the attached drawings for the specific structure, performance, main technical parameters and external dimensions of the general-purpose bridge crane manufactured by our factory.
The technical basis for the design and manufacture of general overhead cranes is GB3811 "Code for Design of Cranes". The on-site experiment and acceptance of general bridge cranes are based on GB/T14405 "General bridge cranes.
Heavy Machinery" National Standard.
The conditions of use for the normal supply of general overhead cranes are:
1. The power supply used by the crane is three-phase AC, the frequency is 50Hz, and the voltage is 380V. The allowable voltage fluctuations on motors and appliances are +10 and -15 of the rated voltage.
2. The working conditions of the crane are:
①Indoor temperature is -5~40℃; outdoor temperature is -25~40℃.
② There shall be no flammable, explosive and corrosive gases in the working environment (except for explosion-proof cranes).
③ The radiant heat temperature of the lifting items to the hook part of the crane shall not exceed 300℃. If it exceeds the above range, it will be handled according to special requirements. 3. The running track of the crane shall comply with the provisions of GB10183 standard. 打印准备:

需要更多的格式吗?

如果你需要一个不同的格式,请打开一个新的支持票和为此请求。我们可以转换到 3D 模型: .stl, .c4d, .obj, .fbx, .ma/.mb, .3ds, .3dm, .dxf/.dwg, .max. .blend, .skp, .glb. 我们不转换 3d 场景 以及 .step, .iges, .stp, .sldprt 等格式。!

使用信息

50 ton bridge crane mechanical and electrical diagram - 您可以根据基本许可或扩展许可,将此免版税 3D 模型用于个人或商业用途。

基本许可涵盖大多数标准用例,包括数字广告、设计和可视化项目、商业社交媒体账户、原生应用、Web 应用、视频游戏以及实体或数字最终产品(免费和出售)。

扩展许可包含基本许可授予的所有权利,没有任何使用限制,并允许在免版税条款下将 3D 模型用于无限的商业项目。
阅读更多

你提供退款保证呢?

是的我们做了。如果你购买的产品呈现或描述中发现一些错误,我们会尽快解决这个问题。如果我们不能纠正错误,我们将取消您的订单,你会得到你的钱回来在 24 小时内下载该项目。 阅读更多的条件在这里

关键字

50 ton bridge crane mechanical electrical
没有对这一项目的评论。